Table of contents
-
Executive summary
- Indonesia’s electrification programme to drive domestic coal demand
- Trends contributing to increase in coal consumption for power generation
- Potential risks
Tables and charts
This report includes the following images and tables:
- Existing power plants that are 100 MW and above
- Upcoming power plants projects that are 100 MW and above
- Indonesia's declining coal quality
- Coal consumption of power plants in Indonesia (yearly basis)
What's included
This report contains:
Other reports you may be interested in
Fairview
The Fairview coal seam gas (CSG) project is located in the Bowen Basin, Queensland.
$3,720South Sumatra-West Java Pipeline
The South Sumatra-West Java (SSWJ) gas transmission project consists of the SSWJ Phase I and SSWJ Phase II pipelines operated by PGN.
$2,580Global alumina refinery asset cost summary
The Global Alumina Asset Summary examines the cost environment in the base year as well as historically and forward five years.