Asset Report

Vickery coal mine

Get this report

$2,550

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Vickery is a coal project located in the Gunnedah Basin of New South Wales. The Vickery licence consists of Vickery (CL316) and Vickery South. Approximately 60% of Vickery's output is targeted to be exported as semi-soft coking coal. The remainder will be largely sold as export thermal coal, with a small amount of domestic thermal coal. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
    • Participation
    • Production
    • Production
    • Operations
    • Infrastructure
    • Cash costs
    • Capital costs

Tables and charts

This report includes 16 images and tables including:

  • Vickery Thermal Coal Emission Intensity Quartile Ranking - Total global production - Saleable tonnes
  • Vickery Metallurgical Coal Emission Intensity Quartile Ranking - Total global production - Saleable tonnes
  • Detailed map
  • Coal seams
  • Marketable reserves
  • Production
  • Cash costs
  • Cash costs
  • Product quality
  • Economic assumptions

What's included

This report contains:

  • Document

    Vickery coal mine

    PDF 1.56 MB

  • Document

    Vickery coal mine

    ZIP 1.05 MB

  • Document

    Asset_Vickery.xlsx

    XLSX 183.01 KB

  • Document

    Vickery-LIVE_Australia-BASE.XLS

    XLS 634.50 KB