Asset Report
Altamira - LNG regas terminal
Report summary
With population growth and economic development leading to strong growth in electricity demand, central Mexico began to need new energy supplies in the late 1990s and early 2000s. With declining North American gas production, LNG emerged as a cost-competitive option. The first proposal for the Altamira terminal was announced by Shell and El Paso Energy in June, 2001. El Paso pulled out of the venture in 2003, but Shell chose to continue development, with Total acquiring a 25% stake in ...
Table of contents
- Key facts
- Location maps
- Terminal overview
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 5 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Location maps: Image 1
- Approximate Monthly Import Data by Country
What's included
This report contains:
Other reports you may be interested in
Asset Report
Sakaide - LNG regas terminal
The Sakaide LNG terminal is located in Sakaide, Kagawa, Japan. The terminal boasts a storage capacity of 180,000 m3 and an annual ...
$1,200
Asset Report
Dalian - LNG regas terminal
PetroChina's Dalian LNG terminal is 50 kilometres from Dalian, on the Dagushan Peninsula in northeast China. The terminal received ...
$1,200
Asset Report
Shanghai - LNG regas terminal
The owner of the terminal, Shanghai LNG, is a joint venture between CNOOC Gas and Power (45%) and Shenergy Group (55%), the Shanghai ...
$1,200