Arun Regas - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

As of September 2014, PERTAMINA has completed 95% of the regasification conversion project and the 350 km Arun-Belawan pipeline. The commissioning period is likely to take three months starting in October 2014. The initial phase will see 1.5 mmtpa of regasification capacity estimated at US$80 million (US$ real 2014). The low cost of this terminal is a result of utilising existing facilities from the Arun liquefaction plant as the last LNG contract expires in October 2014. The conversion ...

What's included

This report contains

  • Document

    Arun Regas - LNG regas terminal

    PDF 501.37 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 4 images and tables including:

Images

  • Map

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

You may be interested in

Asset report

Natuna D Alpha LNG

Asset report

Abadi - LNG

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898