Bahrain proposed LNG regas project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Location maps
- Proposed projects - overview
- Location detail
Tables and charts
This report includes the following images and tables:
-
MapLocation detail: Table 1
What's included
This report contains:
Other reports you may be interested in
North Field East (LNG) - upstream
The 32 mmtpa North Field East (NFE) LNG development is the single largest LNG project to be sanctioned in history.
$3,720Zeebrugge - LNG regas terminal
The Zeebrugge LNG regasification terminal asset report
$1,450Bahrain LNG - LNG regas terminal
Bahrain LNG terminal began operations in May 2025 after five-year delay. Bahrain Spirit FSU traded as carrier from 2020 to 2025.
$1,450