Asset Report

CP2 LNG - Phase 1

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Venture Global CP2 LNG and Venture Global CP Express, both wholly owned subsidiaries of Venture Global, are proposing to build, own and operate the CP2 LNG project and the CP Express pipeline.The CP2 LNG project will consist of two project phases. Each phase will have a total liquefaction facility of around 10 mmtpa and include 18 liquefaction trains and two 200,000 m3 storage tanks. The liquefaction trains will be identical to the mid-scale, modular design implemented at Calcasieu Pass LNG ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Commercial structure
  • Timeline
    • Development
    • EPC
    • Pipeline
  • LNG contracts
    • Economic assumptions
      • Plant Economics
      • LNG Price
      • Fiscal and regulatory
    • Feedgas
    • Transport
    • Fuel gas & power
    • Grid Breakeven Price
    • LNG Plant Breakeven Price
    • FOB Breakeven

Tables and charts

This report includes 10 images and tables including:

  • Key facts: Table 1
  • Commercial structure: Image 1
  • Timeline: Table 1
  • LNG output: Image 1
  • LNG contracts: Image 1
  • LNG contracts: Table 1
  • Summary economics
  • Breakeven economics (US$/mmBtu)
  • FOB breakeven analysis (post-tax)
  • Detail Map

What's included

This report contains:

  • Document

    Phase 1

    PDF 1015.47 KB