Asset report

Joetsu - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Construction work at the Joetsu terminal started in April 2007. The terminal received its commissioning cargo in October 2011 from Indonesia. In February 2012, a second cargo arrived, this time from Qatar, in order to begin trial operations of the power plant. Since then cargoes have come from a wide range of sources, reflecting Chubu Electrics diverse contract base. The initial phase of the Joetsu development includes three 180,000 m³ LNG storage tanks.

What's included

This report contains

  • Document

    Joetsu - LNG regas terminal

    PDF 448.61 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

Images

  • Location maps: Image 1
  • Approximate Monthly Import Data by Country

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3