Asset Report
Map Ta Phut 1 - LNG regas terminal
Report summary
The Map Ta Phut terminal began operations in 2011. Currently it has 11.5-mmtpa of send-out capacity and 640,000m³ of LNG storage. The regas facility is operated by PTT LNG. Other companies can use the terminal through the Third-party framework.
Table of contents
- Key facts
- Location maps
- Terminal overview
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 5 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Map
- Approximate Monthly Import Data by Total
What's included
This report contains:
Other reports you may be interested in
Asset Report
Map Ta Phut 2 - LNG regas terminal
The Map Ta Phut LNG Terminal 2, previously known as the Nong Fab LNG Terminal, received approval for its construction from the National ...
$1,200
Asset Report
Kita Kyushu (Hibiki) - LNG regas terminal
The Hibiki terminal started commercial operations in November 2014, becoming the third operational terminal on the southern Japanese ...
$1,200
Asset Report
Sakaide - LNG regas terminal
The Sakaide LNG terminal is located in Sakaide, Kagawa, Japan. The terminal boasts a storage capacity of 180,000 m3 and an annual ...
$1,200