Asset report

Samcheok - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Samcheok LNG began operations in June 2014. It is South Korea's fifth regas terminal (and KOGAS' fourth). It is owned and operated by KOGAS and is the only regasification facility on the east coast of the mainland. The EPC was awarded to POSCO E&C and construction began in October 2010.Samcheok has a nominal regasification capacity of 9 mmtpa and a peak sendout capacity of 1 320 tonnes/hour. By 2017 the terminal will have 12 storage tanks with a total capacity of 2 610 000 ...

What's included

This report contains

  • Document

    Samcheok - LNG regas terminal.xls

    XLS 174.50 KB

  • Document

    Samcheok - LNG regas terminal

    PDF 338.17 KB

  • Document

    Samcheok - LNG regas terminal

    ZIP 391.33 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

Images

  • Map
  • Approximate Monthly Import Data by Country

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898