Asset report

South Hook - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

After gaining planning permission and completing the preliminary site preparations construction of the South Hook regas terminal commenced in the first half of 2005. CB&I was awarded the Engineering Procurement and Construction (EPC) contract to develop the facility.The terminal received its first cargo in March 2009 when the Tembek carrier docked at the terminal. The first gas was delivered to the National Transmission System in April 2009 and the terminal entered full commercial ...

What's included

This report contains

  • Document

    South Hook - LNG regas terminal.xls

    XLS 214.00 KB

  • Document

    South Hook - LNG regas terminal

    PDF 608.73 KB

  • Document

    South Hook - LNG regas terminal

    ZIP 666.09 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

Images

  • Map
  • Approximate Monthly Import Data by Country

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898