The smelter was commissioned on a greenfield site in 1959 to smelt and fire-refine concentrates for the Messina Group of Mines. Anode casting facilities were added when the refinery was commissioned in 1980. Production in 1992 was affected by a six week maintenance shutdown in September/October, unscheduled power cuts and a reduction in concentrate purchases due to cash flow constraints. A lack of concentrates resulted in a further reduction in production during 1993. In January and...
Table of contents
- Environmental
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
San Luis Potosi (closed) copper smelter
A detailed analysis of the San Luis Potosi copper smelter.
$2,250
Asset Report
Tongling (Jinchang) (closed) copper smelter
A detailed analysis of the Tongling (Jinchang) copper smelter.
$2,250
Asset Report
Copper Cliff (closed) copper smelter
A detailed analysis of the Copper Cliff copper smelter.
$2,250