Asset Report
Antam Mines bauxite mine
Report summary
The company had operated at Kijang in the Riau Islands since 1935 until closure in 2013. Its interest in the Tayan deposit extends only to NMA production. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
- Power
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
06 December 2022
Rainy River gold mine project
Asset Report
Rainy River gold mine project
A detailed analysis of the Rainy River gold mine project.
$2,25006 January 2023
Boddington bauxite mine
Asset Report
Boddington bauxite mine
A detailed analysis of the Boddington bauxite mine.
$2,25006 January 2023
Discovery Bay bauxite mine
Asset Report
Discovery Bay bauxite mine
A detailed analysis of the Discovery Bay bauxite mine.
$2,250