The Assafou-Dibibango project is a gold development project on Endeavour Mining's Tanda-Iguela property in eastern Côte d'Ivoire, approximately 280 km northeast of Abidjan and adjacent to the Ghana border. The Assafou deposit was discovered in 2022 and has grown rapidly. The project is at the post Definitive Feasibility Study (DFS), pre-construction stage. The DFS, announced on 23 April 2026, outlines a conventional open pit, drill and blast operation feeding a 5 Mtpa gravity/carbon-in-leach (CIL) plant, producing an average of 257 koz per year over a 16-year mine life.