Asset Report
Aznalcollar (Los Frailes) zinc mine project
Report summary
Los Frailes mine in Aznalcóllar, located 36km north-west of Seville, is expected to resume operations by around 2020. In 1998 there was a serious failure of the tailings dam, this coupled with low prevailing zinc prices and Boliden's unwillingness to invest in the pushback for the Pit 3 shell, led to the mine's closure in 2001. On 20 February, 2015 the operational rights were awarded to a consortium of Grupo Mexico and Minorbis. They are planning on operating an underground mine, with a maximum mill capacity of approximately 2.7Mt/a.
Table of contents
- Summary
- Key Issues
- Emissions
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 2 images and tables including:
- Aznalcollar Emission Intensity Quartile ranking – total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ozernoye zinc mine project
A detailed analysis of the Ozernoye zinc mine project.
$2,250
Asset Report
Corani zinc mine project
A detailed production, commercial and competitive analysis of the Corani zinc mine project.
$2,250
Asset Report
Ambler zinc mine project
A detailed analysis of the Ambler zinc mine project.
$2,250