Asset Report
Bahuerachi zinc mine project
Report summary
In 2007, a prefeasibility study was released considering an open-pit and a 60kt/d ore mill operation to produce zinc, copper and molybdenum concentrates. The 2022 start-up date for commercial production is only indicative. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Processing
- CAPEX
- Royalties and taxes
Tables and charts
This report includes 2 images and tables including:
- Bahuerachi Emission Intensity Quartile ranking – Total global production - Tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Pine Point zinc mine project
A detailed analysis of the Pine Point zinc mine project.
$2,250
Asset Report
West Whundo zinc mine project
A detailed analysis of the West Whundo zinc mine project.
$2,250
Asset Report
Admiral Bay zinc mine project
A detailed analysis of the Admiral Bay zinc mine project.
$2,250