Asset report

Bilbao zinc mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Bilbao project comprises a skarn deposit to be mined mainly by longhole open stoping underground mining method and processed through a concentrator with 2kt/d ore capacity. It is expected to produce a lead concentrate and a zinc concentrate, both with silver content. The concentrates are to be exported through the Manzanillo port. The mine life of the project was estimated at 8 years.

What's included

This report contains

  • Document

    Bilbao Project zinc mine

    XLS 512.00 KB

  • Document

    Bilbao zinc mine project

    PDF 659.64 KB

Table of contents

Tables and charts

This report includes 4 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898