Asset Report

Bilbao zinc mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Bilbao project comprises a skarn deposit to be mined mainly by longhole open stoping underground mining method and processed through a concentrator with 2kt/d ore capacity. It is expected to produce a lead concentrate and a zinc concentrate, both with silver content. The concentrates are to be exported through the Manzanillo port. The mine life of the project was estimated at 8 years. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
    • Power
  • CAPEX
  • Royalties and taxes
  • Permitting

Tables and charts

This report includes 3 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Bilbao Project zinc mine

    XLS 366.00 KB

  • Document

    Bilbao zinc mine project

    PDF 1.23 MB

  • Document

    Bilbao zinc mine project

    ZIP 1.09 MB