Bolivar zinc mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Processing
- CAPEX
- Operating
- Royalties and taxes
Tables and charts
This report includes the following images and tables:
- Bolivar Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Global zinc and lead mine cost summary
This global cost summary report examines production and cost trends in the zinc and lead mining industry.
$6,750Bolivar Sierra zinc mine
A detailed analysis of the Bolivar Sierra zinc mine.
$2,250Flin Flon (closed) copper smelter
A detailed analysis of the Flin Flon copper smelter.
$2,250