Asset Report
Bwana M'Kubwa SxEw copper mine
Report summary
From 1998 to 2002, the Bwana M'Kubwa plant re-processed copper-bearing mine tailings produced by historic operations at the site. From 2002 to October 2008, open pit ore from FQM's Lonshi mine in the DRC was processed at the facility. In October 2008 the Bwana M'Kubwa plant was placed on ‘care and maintenance' after ore supplies from Lonshi ceased. A proposal to mine the 3Mt Fishtie deposit at Kashime near Mkushi, 275km north-east of Lusaka and transport the oxide ore to Bwana M'Kubwa for...
Table of contents
- Summary
- Key Issues
- Mining
-
Processing
- Acid Plant
- Kashime
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Milpillas SxEw copper mine
A detailed production and cost competitive analysis of the Milpillas SxEw copper mine.
$2,250
Asset Report
Gunnison SxEw copper mine project
A detailed analysis of the Gunnison SxEw copper mine project.
$2,250
Asset Report
Tyrone SxEw copper mine
A detailed analysis of the Tyrone SxEw copper mine.
$2,250