Asset report

Cawse - Closed nickel operation

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Cawse Nickel Operations were commissioned in October 1998. First metal production came in February 1999 with a two year ramp up thought necessary before full production can be reached. The commissioning of the power station desalination plant ore preparation and CCD areas was completed in July 1998. Centaur and Union Minière are looking to upgrade the CoS product to sulphate or metal. Construction and working capital requirements for Cawse were fully funded from the December 1997...

What's included

This report contains

  • Document

    Cawse - Closed nickel operation

    XLS 193.50 KB

  • Document

    Cawse - Closed nickel operation

    PDF 302.40 KB

  • Document

    CawNi flow.pdf

    PDF 12.94 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Infrastructure
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Geology: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898