Asset Report

Changsha zinc smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Changsha zinc smelter commenced operations in 1934 with a production level of a few hundred tonnes per annum, produced by horizontal distillation furnaces. In 2002 the smelter's owners were declared bankrupt and production stopped in September. It is assumed that the Changsha smelter is now closed permanently but downstream activities making zinc oxide are continued on the site. The smelter analysis was therefore discontinued from 2003.

Table of contents

  • Summary
  • Key issues
  • Location / Transport
  • Conc. Receipt / Storage
  • Roaster
  • Acid Plant
  • Smelting Furnace
  • Refining
  • Casting Plant
  • Residue Disposal
  • Other

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Changsha zinc smelter

    PDF 1.29 MB