Chengde steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coke
- Coal
- Metallics
- Energy
- Capital Cost
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed Map
- Participation
- Steel plant overview
- Key raw material rates
- Finished steel production
- Total operating cash costs-Finished steel
What's included
This report contains:
Other reports you may be interested in
PETRONAS FLNG 2 - FLNG vessel
PETRONAS FLNG 2 is a floating liquefaction vessel measuring 393 metres long, 64 metres wide and 31 metres high. It is currently located ...
$2,700PETRONAS FLNG 2 - commercial overview
The SB H block in deepwater Sabah contains four gas fields that will be developed as part of the first phase of a Floating LNG (FLNG) ...
$2,700Bontang LNG - Commercial Overview
The Bontang LNG project in East Kalimantan, Indonesia, is one of the world's largest liquefaction facilities, with eight processing ...
$2,700