Asset Report

Chirano gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The mine is owned and operated by Kinross who acquired the mine in 2010. Production is from a combination of open pit and underground mines. The ore is treated in a 3.5Mt/a conventional plant. Production is expected to cease in 2021. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Processing
  • Power

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Chirano gold mine

    XLS 125.50 KB

  • Document

    Chirano gold mine

    PDF 1.28 MB

  • Document

    Chirano gold mine

    ZIP 1.11 MB