Asset report

Clarksville zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Clarksville electrolytic zinc smelter was built on a greenfield site and commissioned in 1979. The design capacity was for a production of 81.6kt/a zinc and 270t/a cadmium. Production has gradually been increased by a series of minor improvements and capacity is estimated at 120kt/a in 2005 limited generally by roasting. Oxygen in roasting was introduced in 1987 and a pressure swing absorption (PSA) plant was installed in 1992. The Clarksville smelter was designed to treat Tennessee...

What's included

This report contains

  • Document

    Clarksville zinc smelter.xls

    XLS 536.00 KB

  • Document

    Clarksville zinc smelter

    PDF 836.52 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Roaster & Acid Plant
  • Leaching & Purification
  • Tankhouse, melting & Casting
  • Products: Table 1
  • Products
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898