Asset report

Çöpler gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Production from the heap leach operation commenced in 2011 and is expected to continue up to at least 2020 with average annual gold production of 4.7t/a. Beneath the oxide cap is a refractory sulphide ore resource. Alacer has commenced work on a US$744 million project to treat this ore. Production is expected to commence in 2018 and carry on up to at least 2039.

What's included

This report contains

  • Document

    Çöpler gold mine

    XLS 131.50 KB

  • Document

    Çöpler gold mine

    PDF 1.00 MB

Table of contents

  • Key facts
  • Location maps
  • Summary and key issues
  • Costs
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898