Asset report

Duddar zinc mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Production commenced in 2009 and was suspended in 2014 with resumption expected in 2015. Production has been hampered by the complex orebody as well as labour disputes and security concerns within the region.

What's included

This report contains

  • Document

    Duddar zinc mine

    XLS 538.50 KB

  • Document

    Duddar zinc mine

    PDF 466.49 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898