Asset Report
Esperanza (Cerro Jumil) gold mine project
Report summary
Esperanza is expected to be an open pit operation utilising conventional drill and blast methods.Mine life is estimated at 6 years at an ore production rate of 20kt/d. Ore will be processed by heap leaching methods. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Cerro Casale gold mine project
A detailed analysis of the Cerro Casale gold mine project.
$2,250
Asset Report
Caspiche gold mine project
A detailed analysis of the Caspiche gold mine project.
$2,250
Asset Report
Cerro Quema gold mine project
A detailed analysis of the Cerro Quema gold mine project.
$2,250