Asset report

Frieda River gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Frieda River is copper gold mine project on the border of the Sanduan and East Sepik provinces of Papua New Guinea. A project update in May 2016 indicates a 17 year mine life and ore processing capacity of 40 million tonnes per year. Open pit mining will feed ore to a conventional flotation processing plant to produce an average of 175kt of copper and 250koz of gold in concentrate per year.

What's included

This report contains

  • Document

    Frieda River Project gold mine

    XLS 134.00 KB

  • Document

    Frieda River gold mine project

    PDF 707.19 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Operations
  • Timeline

Tables and charts

This report includes 5 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Reserves and resources: Table 3

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898