Asset report

Gibraltar copper minesite

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The accompanying analysis assumes that mining of leachable material will continue until 2029 and copper concentrate is produced until 2037.

What's included

This report contains

  • Document

    Gibraltar copper minesite

    XLS 595.50 KB

  • Document

    Gibraltar copper minesite

    PDF 1000.43 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Sales contracts
  • Timeline

Tables and charts

This report includes 5 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Reserves and resources: Table 3

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898