Asset Report

Gramalote gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Gramalote is a joint venture between AngloGold Ashanti and B2Gold, where B2Gold is the project operator. Gramalote will be operated as a large-scale high-tonnage open pit mine, with annual ore throughput of 11 Mt/a. On depletion of oxide ore in year 9, up to 15 Mt/a of sulphide ore will be processed. A total of 4.08oz Au is expected to be processed over a 14 year mine life. A preliminary economic assessment update was completed at Gramalote in January 2020, maiden ore reserves (125Mt @0.86g/t containing 3.5Moz Au) have not been altered. The project continues to advance towards a final feasibility study.

Table of contents

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Gramalote gold mine project.xls

    XLS 118.00 KB

  • Document

    Gramalote gold mine project

    PDF 1.12 MB

  • Document

    Gramalote gold mine project

    ZIP 951.99 KB