Asset report

Hachinohe (ISF) zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Hachinohe zinc smelter uses the Imperial Smelting Process (ISP) to make zinc. A process where the Imperial smelting Furnace (ISF) is the key unit operation simultaneously producing lead and zinc. Hachinohe is now the only ISP plant in Japan. The current capacity is 112kt/a slab zinc and there are currently no plans to expand this. Hachinohe is considered as one of if not the best example of ISP operation currently in operation.

What's included

This report contains

  • Document

    Hachinohe zinc smelter.xls

    XLS 550.50 KB

  • Document

    Hachinohe zinc smelter

    PDF 717.62 KB

  • Document

    Annaka zinc smelter.xls

    XLS 549.00 KB

Table of contents

Tables and charts

This report includes 15 images and tables including:

Images

  • Detailed map
  • Costs: Image 1
  • Flowsheet
  • Production

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Feed Preparation
  • Sinter & Acid plants
  • Smelting Furnace
  • Refining
  • Casting
  • Products: Table 1
  • Products

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898