Handan steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital Cost
- Operating cash costs
Tables and charts
This report includes the following images and tables:
-
Detailed MapParticipationSteel plant overview
-
Key raw material ratesFinished steel productionCapital CostTotal operating cash costs-Finished steel
What's included
This report contains:
Other reports you may be interested in
Scunthorpe (BOF) steel plant
British Steel has announced it will close down its blast furnaces in Scunthorpe by 2026, in a move to switch to EAF-based steelmaking.
$2,250Port Talbot (BOF) steel plant
Tata Steel will halt its blast furnace operations by September 2024 as part of its strategic shift towards low-carbon EAF steel production.
$2,250Wenfeng alumina refinery
A detailed analysis of the Wenfeng alumina refinery.
$2,250