Asset Report
Henan Qingpu - BF nickel operation
Report summary
Situated in ChangGe city, Henan province. Utilises two 380m³ blast furnaces. The simplified flowsheet consists of ore drying, crushing, screening, sintering and then blast furnace smelting and casting. NPI grade averages around 4.5% Ni. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ufaley - closed nickel operation
A detailed analysis of the Ufaley nickel operation.
$2,250
Asset Report
Savannah - Restart nickel operation
A detailed analysis of the Savannah restart nickel operation.
$2,250
Asset Report
Yuzhuralnickel - Closed nickel operation
A detailed analysis of the Yuzhuralnickel - Closed nickel operation.
$2,250