Situated in ChangGe city, Henan province. Utilises two 380m³ blast furnaces. The simplified flowsheet consists of ore drying, crushing, screening, sintering and then blast furnace smelting and casting. NPI grade averages around 4.5% Ni. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.