Asset report

Highland Valley copper mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

An extension to add 6 years to mine life is under review. This is considered a highly probable project and is included in the accompanying analysis to support production through to 2026 (vs 2020). Associated capex is assumed at US$500M to be incurred over 2014-2020; this number is based on a historic $300M estimate for a similar extension that pushed back mine life from 2013 to 2019.

What's included

This report contains

  • Document

    Highland Valley copper mine

    PDF 1.01 MB

  • Document

    Highland Valley copper mine.xls

    XLS 641.50 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
    • Mining
    • Process
  • Costs
  • Production
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 12 images and tables including:

Images

  • Detailed map
  • Operating cost
  • Production: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Costs: Table 1
  • CAPEX
  • Production: Table 1
  • Economic assumptions: Table 1
  • Operations: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898