Asset Report

Hitachi copper refinery

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The refinery is located at Hitachi, Ibaraki prefecture and has good road and sea links. Smelting operations commenced at Hitachi in 1908 to treat material from the Hitachi mine.  No.1 tankhouse was commissioned in 1911 and capacity had reached 72kt/a cathode by 1969.  No. 2 tankhouse was commissioned in 1969 with a capacity of 120kt/a cathode and No. 1 tankhouse was shut down in 1983.  The Hitachi smelter was closed in 1976, subsequently; anodes have been supplied from the Saganoseki smelter...

What's included

This report contains

  • Document

    Hitachi copper refinery

    PDF 581.57 KB

  • Document

    Hitachi copper refinery.xls

    XLS 693.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Products: Image 1
  • Costs: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898