Asset Report
Illinois Creek (Closed) gold mine
Report summary
The property has an airstrip, and is accessible by large cargo aircraft. Supplies may also be transported up the Yukon River by barge to within 23 miles of the mine. A winter road or permanent gravel road may be constructed between the mine and the river port. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Basin Creek (Closed) gold mine
A detailed analysis of the Basin Creek (Closed) gold mine.
$2,250
Asset Report
Valdez Creek (Closed) gold mine
A detailed analysis of the Valdez Creek (Closed) gold mine.
$2,250
Asset Report
Pine Creek (Closed) gold mine
A detailed analysis of the Pine Creek (Closed) gold mine.
$2,250