Asset Report

Iron Bridge iron ore mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Iron Bridge is a magnetite mine in the Pilbara region of Western Australia. It is a joint venture between FMG Limited and Formosa Plastics Group after Formosa invested in the Iron Bridge Joint Venture in 2013. Iron Bridge will produce 22 Mtpa of a 67% Fe concentrate commenced in April 2023 at a revised capital cost of about US$4 billion. The high Fe grade and low impurity concentrate will be highly valued by steel plants and will achieve a price premium relative to the 62% Fe fines index.

Table of contents

  • Emissions

Tables and charts

This report includes 13 images and tables including:

  • Iron Bridge Emission Intensity Quartile ranking – total global production - tonnes of ore
  • Detail map
  • Participation
  • Marketable reserves (at 01/01/2024)
  • Production
  • Production
  • Operations
  • Infrastructure
  • Cash costs
  • Cash Costs
  • Capital Costs
  • Product quality
  • Economic assumptions

What's included

This report contains:

  • Document

    Iron Bridge iron ore mine

    PDF 1.67 MB

  • Document

    Iron Bridge.xls

    XLS 165.50 KB