Asset Report
Iscaycruz Restart zinc mine project
Report summary
In October 2015 Glencore announced the temporarily suspension of operations at Iscaycruz and other mine operations. Glencore shut down operations by November 2015 and the operation continued on care and maintenance throughout H1 2019. Operations resumed with open pit operations and underground operations shortly after. The expected life of Iscaycruz is around 3 years based on reserves and 5 years based on resources. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
-
Emissions
- Detailed map
- Mining
- Processing
- Royalties and taxes
Tables and charts
This report includes 4 images and tables including:
- Iscaycruz Restart Emission Intensity Quartile ranking – Total global production - Tonnes Zn equivalent
What's included
This report contains:
Other reports you may be interested in
Asset Report
San Martin Restart zinc mine project
A detailed analysis along the production and comercialisation chain of the San Martin Restart zinc mine project
$2,250
Asset Report
Thalanga Restart zinc mine
A detailed analysis of the Thalanga Restart zinc mine
$2,250
Asset Report
Bongara Restart zinc mine project
A detailed analysis of the Bongara Restart zinc mine project.
$2,250