Asset Report
Jinguang Qinghai EAF - Closed nickel operation
Report summary
Located in Qinghai Province near Xining City. Commissioned in November 2007 at a capital cost of RMB1bn. Utilises a single 125MVA EAF and 4 PMVA "convertors". The smelter produces NPI with a grade of around 10% Ni. This is a Fe-Ni-Cr operations which commenced construction in March 2007 and was commissioned in November. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Detailed map
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Xuzhuo Jinxiang EAF - closed nickel operation
A detailed analysis of the Xuzhuo Jinxiang EAF - closed nickel operation.
$2,250
Asset Report
Dongmau EAF - Closed nickel operation
A detailed analysis of the Dongmau EAF nickel operation.
$2,250
Asset Report
Honghang EAF - Closed nickel operation
A detailed analysis of the Honghang EAF - Closed nickel operation.
$2,250