Asset report

Juiz de Fora zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The smelter was commissioned in 1980 with a capacity of 35kt/a zinc (tankhouse limited) and 52kt/a sulphuric acid at a cost of US$63M location being chosen through fiscal incentives. Ownership was by a private company Companhia Paraibuna de Metais (CPM). In 1986 a US$15M expansion increased capacity to 49kt/a zinc and rectified the tankhouse limitation and the introduction of oxygen on the roaster in 1987 and the installation of a liquid sulphur dioxide plant increased capacity to...

What's included

This report contains

  • Document

    Juiz de Fora zinc smelter

    PDF 805.55 KB

  • Document

    Juiz de Fora zinc smelter.xls

    XLS 539.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Projects
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

Asset report

Tubarao steel plant

Asset report

Santa Cruz steel plant

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898