Asset report

Kaili zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Kaili zinc smelter used crude zinc oxide feed supplied from steelworks as its raw materials for zinc slab production. The plant used direct leaching (after initial dehalogenation of the feed) technology allied to purification and electrolysis as the basis for its production flowsheet. Due to poor economics the plant was closed in 2015.

What's included

This report contains

  • Document

    Kaili zinc smelter

    PDF 775.12 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898