Karara Phase 2 iron ore mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Cash costs
Tables and charts
This report includes the following images and tables:
- Cash Costs
- Capital costs
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
Nimba (Yekepa) Phase 2 iron ore mine
ArcelorMittal's Nimba Phase 2 expansion produced the first concentrate in late 2024.
$2,250Simandou (Blocks 1 and 2) iron ore mine
Once operational, Chinese state-owned entities may hold and control 45% of the entire Simandou deposit.
$2,250El Aouj iron ore mine
A feasibility study for Stage 1 of the 11 Mtpa El Aouj deposit was completed at the end of 2015; the mine will start operating in Q1 2027.
$2,250