Asset Report

Kibali (Moto) gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Kibali is comprised of the Karagba-Chauffeur-Durba (KCD) open-pit and the KCD underground mining operation, along with the other main deposits Pakaka, Kombokolo, Pamao, Sessenge and Mengu Hill. Mining was completed at the Mofu open pit in 2015, the Mengu Hill pit and the Rhino open pit in 2016. The mine life of the deposits varies considerably with some having a mine life of less than two years. The concentrator is comprised of twin-circuit oxide and sulphide process routes, with a carbon in leach circuit and gravity recovery.

Table of contents

  • Summary
  • Key issues
    • Mining
    • Processing
    • Power

Tables and charts

This report includes 2 images and tables including:

  • Kibali (Moto) Emission Intensity Quartile ranking – total global production - tonnes Au equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Kibali (Moto) Project gold mine

    XLS 131.00 KB

  • Document

    Kibali (Moto) gold mine

    PDF 1.60 MB

  • Document

    Kibali (Moto) gold mine

    ZIP 1.04 MB