Asset Report

Kihabe-Nxuu zinc mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Kihabe-Nxuu are SEDEX deposit to be mined by conventional open pit method. The zinc oxides will be processed using tank acid leaching and electro-winning to produce Zn cathodes. The lead oxides and sulphides will be recovered through flotation and concentration to produce Pb and Zn concentrates for shipment to a smelter. An extension of the company's prospecting licence, which included Kihaba-Nxuu, was rejected in 2013. The company appealed the rejection decision in 2015 and in January 2016 a new Prospecting Licence was granted. Since, the company has updated Mineral Resources and continues to study the economics of by-products found within the deposits. Development of the project is uncertain and we have assumed an earliest possible start up date of 2028.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Kihabe-Nxuu zinc mine project

    PDF 1.13 MB