Asset report

Kihabe-Nxuu zinc mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Kihabe Nxuu is an advanced stage project with Mount Burgess currently finalising work on a scoping study. The study was due to be completed in 2012. An extension of the company's prospecting licence which included Kihaba Nxuu was rejected in 2013. The company appealed the rejection decision in 2015 and in July 2015 was still waiting for the final result. Development of the project is uncertain and we have assumed an earliest possible start up date of 2019.

What's included

This report contains

  • Document

    Kihabe-Nxuu zinc mine project

    PDF 840.25 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898