Report summary
While Korba was the last greenfield site outside of China to use Søderberg cells, the prebake cells were the first outside of China to employ Chinese technology. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Emissions
- Alumina Source
- Anode Source
-
Power
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 5 images and tables including:
- Korba (P) Emission Intensity Quartile ranking – Total global production - Tonnes Al
- Detailed map
What's included
This report contains:
Other reports you may be interested in
04 May 2022
Qingtongxia (P) aluminium smelter
Asset Report
Qingtongxia (P) aluminium smelter
A detailed analysis of the Qingtongxia (P) aluminium smelter.
$2,25016 November 2021
Fushun (P) aluminium smelter
Asset Report
Fushun (P) aluminium smelter
A detailed analysis of the Fushun (P) aluminium smelter.
$2,25004 May 2022
Yunnan (P) aluminium smelter
Asset Report
Yunnan (P) aluminium smelter
A detailed analysis of the Yunnan aluminium smelter.
$2,250