Asset report

Liancheng (P) aluminium smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

With the permanent closure of the Søderberg lines in 2004 Liancheng became an exclusively prebake operation. The two prebake sites are costed as a single entity.

What's included

This report contains

  • Document

    Liancheng (P) aluminium smelter

    XLS 99.50 KB

  • Document

    Liancheng (P) aluminium smelter

    PDF 572.46 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Raw materials
  • Process overview
  • Products
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1
  • Process overview: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898