Asset Report

Kunming zinc smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The original Kunming zinc smelter had a capacity of 10kt/a and was commissioned in 1985. Work was started in 2000 to expand the zinc smelter to a nominal 50kt/a capacity The expansion finally commissioned in 2002. At the end of 2008, a new 100kt/a acid plant was commissioned at the zinc smelter site to treat the off-gases from the zinc smelter roasters. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Other

Tables and charts

This report includes 8 images and tables including:

  • Kunming Zinc Smelter Emission Intensity Quartile Ranking – total global production - tonnes Zn
  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Kunming zinc smelter

    PDF 1.78 MB