Lanping zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Construction of the 100kt/a smelter was started in March 2004 with commissioning taking place in August 2005. It is called the Lanping No2 Smelter (Huangmu was known as Lanping No1). After ore-dressing, the oxide and sulphide streams are treated in separate lines. The sulphide representing 30% of input, is roasted whilst the oxide, 70% of input, is leached after crushing and ball grinding and then joins the sulphide stream for electrowinning and casting.

What's included

This report contains

  • Document

    Lanping zinc smelter

    PDF 636.81 KB

  • Document

    Lanping zinc smelter.xls

    XLS 499.50 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Projects
  • Location maps
  • Participation
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 10 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898