Asset report

Lanping zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Construction of the 100kt/a smelter was started in March 2004 with commissioning taking place in August 2005. It is called the Lanping No2 Smelter (Huangmu was known as Lanping No1). After ore dressing the oxide and sulphide streams are treated in separate lines. The sulphide representing 30% of input is roasted whilst the oxide 70% of input is leached after crushing and ball grinding and then joins the sulphide stream for electrowinning and casting.

What's included

This report contains

  • Document

    Lanping zinc smelter

    PDF 636.78 KB

  • Document

    Lanping zinc smelter.xls

    XLS 503.50 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Projects
  • Location maps
  • Participation
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 10 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898