Asset Report

Lanping zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Lanping zinc smelter

Report summary

Construction of the 100kt/a smelter was started in March 2004 with commissioning taking place in August 2005. It is called the Lanping No2 Smelter (Huangmu was known as Lanping No1). After ore-dressing, the oxide and sulphide streams are treated in separate lines. The sulphide representing 30% of input, is roasted whilst the oxide, 70% of input, is leached after crushing and ball grinding and then joins the sulphide stream for electrowinning and casting.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Projects
  • Location maps
  • Participation
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 10 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Participation: Table 1
  • Flowsheet
  • Products: Image 1
  • Products: Table 1
  • Products: Table 2
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Lanping zinc smelter

    PDF 1.07 MB

  • Document

    Lanping zinc smelter.xls

    XLS 433.00 KB

Other reports you may be interested in

Browse reports by Industry Sector