Asset Report

Lingshi (Alumina) alumina refinery

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

20 June 2019

Lingshi (Alumina) alumina refinery

Report summary

Lingshi was designed in 3 phases: two 800ktpa phases and one 1000ktpa phase. Phase one was commissioned in early 2016 and phase two in December 2016. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Bauxite
  • Digestion
  • Calcining
  • Environmental
  • Power

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Lingshi (Alumina) alumina refinery

    XLS 310.50 KB

  • Document

    Lingshi (Alumina) alumina refinery

    ZIP 1.15 MB

  • Document

    Lingshi (Alumina) alumina refinery

    ZIP 1.15 MB

Trusted by leading organisations