Asset report

Loma Larga gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Technical Report published in August 2016 envisions for this project an underground mine and a conventional 3kt/d ore flotation plant to get two saleable concentrates a copper concentrate and a pyrite concentrate both containing significant amount of gold and silver. The tailing deposition selected is the Dry Stack Tailing Method. The estimated initial capital investment is US$285.9 million. The estimated mine life is 12 years producing on average 150koz Au/a but higher grades and hence production during the first years of operation.

What's included

This report contains

  • Document

    Loma Larga gold mine poject

    XLS 122.00 KB

  • Document

    Loma Larga gold mine project

    PDF 504.30 KB

Table of contents

  • Key facts
    • Summary
    • The Loma Larga (formerly named Quimsacocha) property is located at an elevation of 3,800m above mean sea level.
    • Key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Infrastructure
    • CAPEX
    • Mining
    • Processing
    • Royalties and taxes
    • Permitting
    • Community relations
    • Environmental reclamation
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898