Asset Report
Loma Larga gold mine project
Report summary
In January 2019 INV Metals published a Technical Report on its 2018 Feasibility Study. This project envisions an underground mine and a conventional 3kt/d ore flotation plant to get two saleable concentrates, a copper concentrate and a pyrite concentrate both containing significant amount of gold and silver. An expansion to 3.4kt/d ore was expected from year four to offset the lower head grades at that time. The Q3 2018 Feasibility Study estimated an initial capital investment of US$309.47 million. Our 2020 analysis assumes production start up in 2025.
Table of contents
- Summary
- Key issues
- CAPEX
- Mining
- Processing
- Royalties and taxes
- Permitting
- Community relations
- Environmental reclamation
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Springpole gold mine project
A detailed analysis of the Springpole gold mine project
$2,250
Asset Report
Salares Norte gold mine project
A detailed analysis of the Salares Norte gold mine project
$2,250
Asset Report
Black Volta gold mine project
A detailed analysis of the Black Volta gold mine project.
$2,250